Boiler Heating Pipe / Tubes/Economizer/Pipeline Water Heat Exchanger

Product Details
Customization: Available
After-sales Service: Yes
Warranty: Yes
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Experienced Team
The supplier has 6 foreign trading staff(s) and 6 staff(s) with over 6 years of overseas trading experience
Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
to see all verified strength labels (13)
  • Boiler Heating Pipe / Tubes/Economizer/Pipeline Water Heat Exchanger
  • Boiler Heating Pipe / Tubes/Economizer/Pipeline Water Heat Exchanger
  • Boiler Heating Pipe / Tubes/Economizer/Pipeline Water Heat Exchanger
  • Boiler Heating Pipe / Tubes/Economizer/Pipeline Water Heat Exchanger
  • Boiler Heating Pipe / Tubes/Economizer/Pipeline Water Heat Exchanger
  • Boiler Heating Pipe / Tubes/Economizer/Pipeline Water Heat Exchanger
Find Similar Products

Basic Info.

Model NO.
Boiler Pipes
Type
Seamless
Technique
Hot Rolled
Material
Carbon Steel
Surface Treatment
Varnishing
Usage
Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose
Section Shape
Square
Delivery Time
15days
Test
as Required
Trade Term
Fob CFR CIF
Country of Origin
China
Transport Package
in Bundle
Specification
As Required
Trademark
Chief Steel
Origin
China
HS Code
730519
Production Capacity
2000, 000ton

Product Description

Boiler Heating Pipe / Tubes/Economizer/Pipeline Water Heat Exchanger
MAIN PRODUCTS:

- WELDED STEEL PIPE  ( ERW, LSAW, SSAW, RBE, SHS, RHC)
- SEAMLESS STEEL PIPE ( 1/2" - 40")
- STAINLESS STEEL PIPE  
- SHEET PILES ( HOT ROLLED, COILD FORMED, U TYPE, Z TYPE, TRENCH ,etc.)
- STRUCTION STEEL ( H BEAMS, STEEL PLATE, COILS )

Boiler Heating Pipe / Tubes/Economizer/Pipeline Water Heat ExchangerBoiler Heating Pipe / Tubes/Economizer/Pipeline Water Heat Exchanger

Boiler Heating Pipe / Tubes/Economizer/Pipeline Water Heat ExchangerBoiler Heating Pipe / Tubes/Economizer/Pipeline Water Heat ExchangerBoiler Heating Pipe / Tubes/Economizer/Pipeline Water Heat ExchangerBoiler Heating Pipe / Tubes/Economizer/Pipeline Water Heat Exchanger

Kindly allow me to introduce our company to your end. Our company is a local supplier of the steel pipes, including welded and seamless carbon steel, alloy steel.etc.  And, the sheet plies, hot rolled and cold formed. We supplied more than 50,000tons pipes to overseas in past few years.


MAIN PRODUCTS:

- WELDED STEEL PIPE  ( ERW, LSAW, SSAW, RBE, SHS, RHC)
- SEAMLESS STEEL PIPE ( 1/2" - 40")
- STAINLESS STEEL PIPE  
- SHEET PILES ( HOT ROLLED, COILD FORMED, U TYPE, Z TYPE, TRENCH ,etc.)
- STRUCTION STEEL ( H BEAMS, STEEL PLATE, COILS )
Commodity HFW welded steel carbon pipeline 
  
Size
O.D 1/2''-24''.
Thickness 1.5mm-15.88mm
Length 6m fixed , or 12m fixed, or based on speial request 
Standards API 5L 45th; ISO3183-2007; ASTM A53, ASTM A252, AS1163
Steel Grades Gr. A GrBx42x46x52x56x60x65x70,etc
internal coating cement mortar lining; bitumen coating; liquid epoxy; FBE
external coating 3lpe; 2lpe; 2LPP; FBE; Bitumen; enamel tape hot-applied; liquid epoxy coating; polyurethane insulated coating.
Manufacture
Process
Cold formed  
Main Application The external coating is mainly used for anti-corrosion protection for liquid pipes before burying. Such pipe has been widely used in rugged environment.
Min quantity 5 tons, more quantity price will be lower.
packing beveled on both pipe ends, with protector caps, in bundles by steel strips. In hexagonal shape bundles wrapped with strong steel trip 2MT/bundle. with 2 slings on each bundles.
Delivery time 20-25days after receiving your deposit or L/C.
Payment TT or 100% Irrevocable LC at sight. We can discuss.
FAQ
Q1:How about thequality?
A:Third party inspections are always welcomed, like TUV.   All of the goods will be released together with MTC and stamped by TPI. 

Q2: How long is the delivery time?
A: Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And alsoaccording to the quantity.

Q3:Do you provide samples? Free or not?
A: Yes, we could offer the sample for free but do not pay the cost of freight.

Q4:May I customize the steel pipe?
A:Sure you can, we can produce according to your requirement, you can send the CAD ordesign drawing.

Q5:Any value-added Services?
A:Fottunately for you,we are very experience in this industry. We have equipped our warehouse with the necessitiesto perform in-house painting,coating,pipe cutting, jointed welding, and make machanical fabricate per to request.  

Q6: How about the trade terms?
A: EXW, FOB, CFR, CIF, LC will be accepted

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier
People who viewed this also viewed