Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163

  • Audited Supplier
  • 8 yrs

Contact Supplier

Product Highlights

  • Comprehensive Warranty Coverage: Includes warranty and after-sales service for all products.
  • Flexible Delivery Time: Delivery ranges from 15 to 60 days depending on quantity.
  • Customizable Dimensions: Length can be customized from 12m to 80m per request.
  • Multiple Surface Treatments: Options include black, oil, bitumen, PE, and Juton coating.
  • Advanced Welding Technique: Utilizes Submerged Arc Welding (SAW) for high strength.
  • Rigorous Quality Inspection: Includes hydraulic, eddy current, infrared, and X-ray tests.
  • Value-Added Services: Offers in-house painting, coating, cutting, and welding.
  • Wide Material Selection: Available in GR.B-X80, S275JR, S355J0H, and St52-0.

Product Images of Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163

Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163
Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163 pictures & photos
Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163
Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163 pictures & photos
Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163
Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163 pictures & photos
Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163
Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163 pictures & photos
Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163
Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163 pictures & photos
Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163
Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163 pictures & photos
Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163
  • Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163
  • Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163
    Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163
  • Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163
    Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163
  • Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163
    Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163
  • Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163
    Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163
  • Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163
    Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163
  • Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163
    Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163

Find Similar Products

Product Description

Product Name API series ssaw steel pipe
Size OD: 219-3220mm
Thickness: 4-25.4mm
Length: fixed lentgh, as 12m - 80m per to requset 
Steel Material GR.B-X80, S275JR/J0/K2H, S355J0H, S355J2H  St52-0 etc.
Standard EN10219 / ASTM A 252 /ASTM A53 / API5L 
Usage Used For Gas, Petroleum, Water ,Oil, Structure, Sewage and Piling pipe
Ends Plain or Beveled (Can be Protected By Plastic Pipe Cap)
Surface Bared Or Paint With Oil, Bitumen,1-3 layer PE, Juton coating, 
(Outside Or Inside Anti-Corrosion Treatment Can Supply)
Inspection With Hydraulic Testing, Eddy Current , Infrared or X-Ray Test
Also With Chemical And Physical Property Inspect
Technique Submerged Arc welding, with cold formed 
Type Welded
Welded Line Type Spiral
Section Shape Round
Package In Bulk, Or Other Method According To The Contract
Date of Delivery Less Than 15/20/25/30/40/50/60 Days According To The Quantity
Port of Shipment Main Port,China
Others: We also supply pipe fittings for example screws and flange
Our products are high quality but low price.
Wish you contact us.

Product application 
Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163

spiral steel pipe can used for low-fluid transportation, oil and gas transportation, as well as used for steel pilings.
production process 
Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163

Packing
Packing:
1.In bundle, black, caps, beveled ends or plain ends
2.OEM/ customer's REQUEST
3.Marks: Standard * Material*OD*WT*L *Lott No./required
Shipping:
a. Length: ≤5.85m, loaded in 20FT Container, Max 22tons
b. Length: ≤11.85m, loaded in 40 FT Container, Max 27tons
c. Length: ≥12m, shipped by bulk vessel. FILO terms
d. Delivery time :about 20-30 days after received deposit 
Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163
Quality testing
Scaffolding Helical Submereged Arc Welded Carbon Steel Pipe&Tube API5l / ASTM A252 / ASTM A53 / En10219 / As1163


FAQ
Q1:How about thequality?
A:Third party inspections are always welcomed, like TUV.   All of the goods will be released together with MTC and stamped by TPI. 

Q2: How long is the delivery time?
A: Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And alsoaccording to the quantity.

Q3:Do you provide samples? Free or not?
A: Yes, we could offer the sample for free but do not pay the cost of freight.

Q4:May I customize the steel pipe?
A:Sure you can, we can produce according to your requirement, you can send the CAD ordesign drawing.

Q5:Any value-added Services?
A:Fottunately for you,we are very experience in this industry. We have equipped our warehouse with the necessitiesto perform in-house painting,coating,pipe cutting, jointed welding, and make machanical fabricate per to request.  

Q6: How about the trade terms?
A: EXW, FOB, CFR, CIF, LC will be accepted.
 

About the Supplier

This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASR244928". Items marked "verified" are certified.

Watch Video
Watch Video
Chief Steel (Shanghai) Trading Co., Ltd.
Chief Steel (Shanghai) Trading Co., Ltd.
Chief Steel (Shanghai) Trading Co., Ltd.
Chief Steel (Shanghai) Trading Co., Ltd.
Chief Steel (Shanghai) Trading Co., Ltd.
Chief Steel (Shanghai) Trading Co., Ltd.
Chief Steel (Shanghai) Trading Co., Ltd.
Chief Steel (Shanghai) Trading Co., Ltd.

About Our Factory & Business Background

Address
Room 1515, Building 6, No. 5000 Gonghexin Road, Baoshan, Shanghai, China
Terms of Payment
LC, T/T, D/P
International Commercial Terms(Incoterms)
FOB, CFR, CIF, EXW
Average Lead Time
Peak Season Lead Time, within 15 workdays, Off Season Lead Time, one month
Nearest Port
Shanghai, TIANJIN, QINDAO

Our Production Capability & Technical Expertise

Main Products
Steel Pipe, ERW Pipe, SSAW, Carbon Steel, Tube, Welded Pipe, Piling Sheet, Fittings, Elbow, Structure

Our Industry Experience & Global Business Record

Export Year
2016-10-01
Main Markets
South America, Eastern Europe, Southeast Asia, Africa, Mid East

FAQ

How about the quality?
Third party inspections are always welcomed, like TUV. All of the goods will be released together with MTC and stamped by TPI.
How long is the delivery time?
Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And alsoaccording to the quantity.
Do you provide samples? Free or not?
Yes, we could offer the sample for free but do not pay the cost of freight.
May I customize the steel pipe?
Sure you can, we can produce according to your requirement, you can send the CAD ordesign drawing.
Any value-added Services?
Fottunately for you,we are very experience in this industry. We have equipped our warehouse with the necessitiesto perform in-house painting,coating,pipe cutting, jointed welding, and make machanical fabricate per to request.
How about the trade terms?
EXW, FOB, CFR, CIF, LC will be accepted.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now