• Hot Dipped Galvanized ERW Carbon Steel Line Pipe
  • Hot Dipped Galvanized ERW Carbon Steel Line Pipe
  • Hot Dipped Galvanized ERW Carbon Steel Line Pipe
  • Hot Dipped Galvanized ERW Carbon Steel Line Pipe
  • Hot Dipped Galvanized ERW Carbon Steel Line Pipe
  • Hot Dipped Galvanized ERW Carbon Steel Line Pipe

Hot Dipped Galvanized ERW Carbon Steel Line Pipe

Type: Welded
Technique: Hot Rolled
Material: Carbon Steel
Surface Treatment: Black
Usage: Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose
Section Shape: Round
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Transport Package
Standard Export Packing

Product Description

ERW / SSAW / LSAW offshore / structure steel pipe with big diameter

For details, please refer to the information as below

 
Products Details
Commodity ERW / SSAW / LSAW offshore / structure steel pipe with big diameter
Outer diameter ERW / HFW LSAW / DSAW SSAW / HSAW RHS SHS
1/8 - 20 inch
(10.3 - 508 mm)
12 - 56 inch
(323.8 - 1,420 mm)
8 - 126 inch
(219.1 - 3,200 mm)
40 x 20 mm -
1,000 x 800 mm
15 x 15 mm -
1,000 × 1,000 mm
Wall thickness 0.4 - 16 mm 6.0 - 40 mm 6.0 - 26 mm 1.0 - 30 mm 0.6 - 30 mm
Length 5.8 ~ 12.0 m or upon customers' requirements
Standard GB/T 3091, GB/T 13793, ASTM A252, ASTM A53, ASTM A500, EN 10210, EN 10219, API 5L,
DIN 1626/1615, DIN 17120, etc.
Grade SS400, Q235, Q345, Q460, A572 Gr.50, Gr.1/Gr.2/Gr.3, S235, S275, S355, Grade A/B, X42, X52,
X60, X70, etc.
Surface Prime quality (bared, oiled, color paint, 3LPE, or other anti-corrosive treatment)
Inspection With Chemical Composition and Mechanical Properties Analysis;
Dimensional and Visual Inspection, also with Nondestructive Inspection.
Application structure, electric power transmission tower projects, piling, water, oil & gas pipeline engineering, mechanical industry, municipal projects, roads and its auxiliary facilities, etc.
Packing Standard export, in bulk / bundles / nylon fabric bags with seaworthy packing;
or according to customers' requestments.
Delivery Time 1. 20-45 days after received deposit or confirmed L/C
2. Depends on your oder quantity
Payment Terms 1. T/T: 30% T/T advance, 70% balance copy of  B/L
2. L/C: at sight
3. T/T and L/C: 30% T/T advance, 70% L/C
Port China main port


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now